Inserting of dump. Concretingafter insertingthe dump. Enlarging window openings up to original dimensions.
Excavation anddemolition workon waste water sewage - excavationfor inserting of waste water pipesin the hall´s ledge rock.
Excavation anddemolition workon waste water sewage - excavationof construction pit for the dumpin ledge rock.
Concretingthe foundation slabfor the dump.
Installationof the dump into the prepared construction pit.
Demolition workon adjusting the window openings to original dimensions.
Brickwork- final walling of baroque sewage for leading pipes of the floor ventilation system in the hall.
Equalizing of floor gradient in the hall, filling in with crushed gravel.
Visit PhDr. Viktor Jasaň, Director General of the SNM.