I. ETAPA > UK > RECONSTRUCTION

HRAMOKA
2016/06
Groundwork–filling in the construction pit for the dump.
Installationof casingfor fillingin the dump well.
Installationof floor ventilation system in the route of original baroque channels.
Finishing workonfloor layers.
Filling in ofexcavations up to the planedgradient.
Filling in of floorswith crushed gravel.
Compaction of sublayers for laying IPT boards.
Brickwork on corrections of walls and window niches.
Brickwork on correction of plasters.
Cutting cable trenches for electric distribution.
Installationof cold water pipes.
Installationof waste water sewage.
Installationof the dump well.