2016/07 - HraMoKa

Prejsť na obsah

Hlavná ponuka:

I. ETAPA > UK > RECONSTRUCTION

HRAMOKA
2016/07

JULY 2016
Preparatory work forconcretingfloor layers.
Installationof IPT boards.
Concretingof IPT boards.
Brickwork on corrections of walls in the hall.
Installationof floor heat insulation (Styrodur).
Installationof separation foil.
Návrat na obsah | Návrat do hlavnej ponuky